Western Divisions
Western Divisions – Railway GK Capsule
| Zone Headquarters | Mumbai (Churchgate) | | Formation | 5 Nov 1951 (after re-organisation of BB&CI Railway) | | Predecessor | Bombay, Baroda & Central India Railway (BB&CI) | | Total Route km | 4,680 km (2023) | | Divisions | 6 – Mumbai WR, Mumbai CR, Vadodara, Ahmedabad, Rajkot, Bhavnagar* | | Major Workshops | Dahod, Lower Parel, Sabarmati, Bhavnagar | | Electrification | 100 % (2022) – 1st zone to complete total electrification | | Famous Trains | August Kranti Rajdhani, Mumbai–Delhi Duronto, Gujarat Sampark Kranti, Double Decker, Vande Bharat (Mumbai–Gandhinagar) |
* Bhavnagar division was created in 2022 by bifurcating Rajkot division.
1. Technical Snapshot
| Parameter | Value |
|---|---|
| Track | BG only (1676 mm) |
| Max. Speed | 160 km/h (Mumbai–Delhi Rajdhani route) |
| Automatic Signalling | Mumbai–Vadodara–Ahmedabad (2021) |
| Kavach (ERTMS-L1) | Mumbai–Ahmedabad (508 km) – trial corridor for Make-in-India ETCS |
| Freight Corridors | WDFC (Rewari–Palanpur–Vadodara–Mumbai) 1,506 km – fully operational 2023 |
| Major Yards | Makarpura (Vadodara), Ajmera (Kalyan), Sabarmati |
| Longest Bridge | Narmada Bridge (1.4 km) near Bharuch |
| Highest Point | Thal Ghat (Elec. loco banking 1:37) |
| Deepest Cut | Bhore Ghat (1:36) |
2. Division-wise Facts
| Division | HQ | Route km (2023) | Key Depots | Unique Feature |
|---|---|---|---|---|
| Mumbai WR | Mumbai Central | 538 | Mumbai Central, Bandra T | Terminus for Rajdhani/Shatabdi |
| Vadodara | Vadodara Jn | 1,104 | Dahod ELS, Vadodara C&W | Largest freight loading division in India |
| Ahmedabad | Ahmedabad | 863 | Sabarmati ELS, Asarva DEMU shed | 1st division to run 100 % AC EMU locals (2020) |
| Rajkot | Rajkot | 1,176 | Rajkot Jn, Jamnagar | Saurashtra peninsula, ports of Pipavav & Okha |
| Bhavnagar | Bhavnagar Para | 565 | Bhavnagar workshop | Newest division (2022) – Alang ship breaking traffic |
| Mumbai CR* | Kalyan | 434 | Kalyan ELS, Parel workshop | Handles Central + Harbour trans-coastal traffic |
*Technically under CR, but WR shares infrastructure up to Vadodara.
3. Historical Milestones
- 1853 – BB&CI opens 1st train in India (Bombay–Thane, 34 km) – operated by GIPR then.
- 1864 – Bombay–Baroda broad gauge line opened.
- 1870 – Indore–Ujjain branch – 1st BG line into Central India.
- 1951 – BB&CI merged into Indian Railways → reborn as “Western Railway” on 5 Nov.
- 1968 – 1st 25 kV AC traction introduced Mumbai Central–Virar section.
- 1988 – Mumbai–Delhi Rajdhani flagged; 1st Rajdhani outside Howrah–Delhi.
- 2003 – Mumbai Metro-1 (Versova–Andheri–Ghatkopar) originally planned under WR but later transferred to MMRDA.
- 2018 – India’s 1st CNG DEMU introduced on Godhra–Kevadiya section.
- 2022 – 100 % electrification declared; last diesel section Palanpur–Samakhiali converted.
- 2023 – Mumbai–Gandhinagar Vande Bharat (2nd gen) clocked 160 km/h trial.
4. Current Status & Recent Updates (2023-24)
- Vande Bharat Expansion: 3rd rake maintained at Sabarmati shed; 4 services daily (Mumbai–Gandhinagar, Mumbai–Shri Mata Vaishno Devi Katra via WR).
- WDFC Integration: 1,506 km Western DFC now carries 35 % of zone’s freight; 1.5 km long double-stack containers (African & European loading gauge) run at 100 km/h.
- Station Redevelopment: Mumbai Central, Vadodara, Ahmedabad (estimated ₹10,000 cr) – being modelled as “Railopolis” transit hubs with 60-floor commercial towers.
- KAVACH: Mumbai–Ahmedabad section (508 km) certified for 160 km/h; 2024 target – extend to Delhi.
- Green Initiatives: 100 % LED, 65 MW solar rooftops (Sabarmati, Dahod, Udvada); 1st H2-fuel hybrid DEMU trial planned in 2025.
- Pink & Ladies Special: Ahmedabad division introduced “Tejaswini” all-women crewed MEMU (2023).
- New Lines: Surendranagar–Dharangadhra–Kuda 90 km (2022), Rajkot–Porbandar doubling (2024), Mumbai–Ahmedabad HSR (508 km) – under construction; 1st pier completed in Valsad district.
5. Weight-age in Railway Exams
| Exam | Expected Qs | Focus Areas |
|---|---|---|
| RRB NTPC 1 & 2 | 2–3 | Zones, HQ, Divisions, famous trains, electrification |
| RRB Group D | 1–2 | Route km, workshops, new divisions |
| RRB JE/Technician | 3–4 | Traction, signalling, WDFC, workshops |
| RPF SI/Constable | 1–2 | Historical firsts, train names, current affairs |
6. Practice MCQs
1. Which of the following is the newest division of Western Railway?
Answer: Bhavnagar (Notified 2022)2. The headquarters of Western Railway is located at
Answer: Mumbai (Churchgate)3. Total route kilometrage of Western Railway as on 31 Mar 2023 was approximately
Answer: 4,680 km4. India’s first CNG DEMU was flagged between
Answer: Godhra – Kevadiya5. Which section of WR was the first to be electrified with 25 kV AC?
Answer: Mumbai Central – Virar6. The WDFC (Western DFC) total length falling under WR jurisdiction is
Answer: 1,506 km7. The longest rail bridge on Western Railway crosses which river?
Answer: Narmada8. Which division handles the highest freight loading in WR?
Answer: Vadodara9. The first Rajdhani Express introduced outside Howrah–Delhi corridor was
Answer: Mumbai–Delhi August Kranti Rajdhani10. The train “Double Decker” on WR runs between
Answer: Mumbai Central – Ahmedabad11. Which of the following sheds maintains the Vande Bharat train for Mumbai–Gandhinagar service?
Answer: Sabarmati ELS12. The steepest ghat section on WR is
Answer: Thal Ghat (1 in 37)13. The first zone to achieve 100 % electrification is
Answer: Western Railway14. The “KAVACH” ETCS trial corridor of 508 km lies on which WR route?
Answer: Mumbai – Ahmedabad15. In which year was Western Railway officially constituted?
Answer: 195116. The Bhavnagar division was carved out of which existing division?
Answer: Rajkot17. Which of the following is NOT a workshop of Western Railway?
Answer: Jamalpur (It belongs to Eastern Railway)Last Updated: 24 Jun 2024 | Source: WR Pink Book 2023-24, Railway Board, PIB.